Front Door Installation X2
The video is part 1. Part two is;
A week after Preston’s' birthday party, My Dad and I removed the door & frame, and leaned them against the house. Next I hacked out a few framing members and the header because they were not square. I had to cut a new header from a beam I had sitting in the back yard. After about two hours, I managed to get that done, and we put some plywood over the doorway opening before I had to go make dinner and clean up for the night.
Next day we put the door frame back in place, and this time I wasn’t in a rush, so I got to square it up correctly. I got about 85% of the screws in place before I hung the door and cut 1 new piece of plywood to replace the 4 poorly done exterior plywood scraps. Many thanks go out to my dad, who did the tedious work of tape removal, and cleaning the glue off of the glass panels. He was a great help. Day done.
Day 3 came about a week later. I finished screwing the frame in place, installed the catch plate for the door latch, and installed the deadbolt. I also finished nailing the plywood and header in place. The door looks and works great, and Kelley is very happy.
Sunday, March 29, 2009
There's a Hole in my Life
Plumbing became this epic adventure for me. I kind of enjoyed the puzzle of getting water from point A to multiple point B's, following the rules of the city's plumbing code, and avoiding any beams that can't be drilled through. I learned how to sweat-solder copper, a task that was familiar to me from soldering audio and power connecters over the years. Mostly I enjoyed it.
It took a lot longer than I had planned on. I didn't factor in how much time it takes being a stay at home dad. I had to constantly reprioritize groceries, laundry, housework, dinners, kid time, homework, Wife time, and a plethora of miscellaneous chores. However, it’s a part of the reason we decided I should be a stay at home dad. Now that it’s been inspected, and passed, it’s on to Electrical, and complete home audio, video, & Internet.
Thursday, March 26, 2009
Fixing a hole where the rain got in.
Sunday, September 7, 2008
Staining the Front Door
Staining wood is a very difficult process at best, complicated by the fact that I have not done any significant quality staining in many years, and you only get one chance to get it right. Armed with this knowledge, I am attempting to do just that to the single most important feature of a home, the entrance.
I have done many color samples on the outside edge of the door frame over the last two months. Kelley and I have compared the look, color, and texture of our dining room table to the samples (see earlier posts' picture), and I have finally come up with the proper custom blend of color and finish.
Saturday, September 6, 2008
Dirk Gently's Holistic Detective Agency
Preston and Nathaniel were home with us, so we had alot of 10 minute breaks. We also took an hour for lunch and a swim. I didn't get video, because I was either straining my back, or my brain.
Sunday, August 31, 2008
Shopping for Fixtures
Kelley and I had shopped just about everywhere for bath fixtures. We spend at least 5 different day-trips, going from big retailers to speciality stores. We eventually agreed upon a set of features, and then refined that by price and quality. Then I went online and looked up product name and numbers. I found a site that was constantly low. I priced them and went back to Great Indoors, because they were having an inventory clearance sale, and our product was going for 55% off. After getting a quote from them for the cheapest they could do, it was still cheaper online, even with shipping. So you guessed it, I orderd them from Plumbing Direct, and everything went great. The Tub and Urinal were on back order, but everything else about the order was perfect. This is what the faucets look like.
6-20-08
Kelley and I had shopped just about everywhere for bath fixtures. We spend at least 5 different day-trips, going from big retailers to speciality stores. We eventually agreed upon a set of features, and then refined that by price and quality. Then I went online and looked up product name and numbers. I found a site that was constantly low. I priced them and went back to Great Indoors, because they were having an inventory clearance sale, and our product was going for 55% off. After getting a quote from them for the cheapest they could do, it was still cheaper online, even with shipping. So you guessed it, I orderd them from Plumbing Direct, and everything went great. The Tub and Urinal were on back order, but everything else about the order was perfect. This is what the fixtures look like.
http://www.us.kohler.com/onlinecatalog/newproducts_detail.jsp?section=2&aid=1163361215304
Saturday, August 30, 2008
Plumbing woes
I spent the last many months working on plumbing, along with ALOT of other stuff. Some weeks all I got done was a run to the hardware store. It's getting harder and harder to keep motivated. I contacted a few plumbers to give me quotes on the project, and I asked for some advice while they were here. I learned that if you asked 10 plumbers how to do a job, you will get 15 different answers. Some things, like parts of the drain line, I redid, after learning what framing members I could drill holes through. I also had to move the tank-less water heater from my original location because the city inspector would not allow me to put it in the garage, because of venting distances and logistics. I expanded the utility/laundry closet upstairs to mount it there, which worked out great. I added a circulating pump to get the hot water moving through the system near the points of use (Bathrooms, Kitchen sink, Laundry) and I'm building a push-button and LED light system for controlling it from said locations.
The city inspector also noted that my biggest and most expensive window, which happens to be overlooking the driveway and front of the house, did not meet egress regulations. That means I need to buy another more expensive window 6 inches bigger.
Reclaiming the Dining room

Kelley and I were feeling a little bit cramped having to eat dinners on the coffee table in the living room for months. Since I had built false walls to separate the old house from the new construction, the time came to move them. We had also just received our new dining room set and needed a place to put it. We kept the sideboard, and china hutch in their crates, but unpacked and assembled the table and chairs.
I would like to mention, that our house is full of holes at this point. Where the front door is eventually going to go is covered in plywood, inside and out, but spiders and cold air find their way in. Also, another reason the moving of the door was good timing; I needed to run the plumbing across the dining room ceiling to the kitchen sink and dishwasher (which we haven't had in months as well), and there now is a hole in the wall where the plumbing makes it's transition to the outside wall.
Friday, August 29, 2008
Front Door saga

Wednesday, August 27, 2008
The Other 11 WIndows
Next I hired two of my out-of-work friends to help me. They did great. We spent two days and got 11 windows in! But we didn't stop there, we spend two more days and worked on 3 sets of French Doors!
I have not been working on the plumbing much this month, due to the logistics of family and getting ready for the window and door instalation. Plus there were numerous other things that ate up my time. Kelley tells me not to take it to hard. It'll get done in time. Just relax. "Isn't this what you always dreamed about? Building your own house" she would remind me.
First Windows
My windows arrived in early Dec. but with Christmas and Nathaniel's' birthday, it took me till the end of the year to get some time to install them. I did the three little ones on my own, so I could figure out what it took to do the job. Then I did some shopping to get all the supplies I needed for the other 11 windows. This is the 9-lite grid pattern I was talking about. The installation was relatively easy. I tried to do the next larger window on my own, but it was just over my weight limit. I walked across the street and asked my enthusiastic neighbor if he could help me, since he is usually ready to learn all he can about building a house. I did better without him.
Tuesday, August 26, 2008
New Roof
As part of the new construction, we are having photovoltaic cells installed on the new second story roof. We had the solar company install the standoffs before the roofers came so it will all be covered under the warranty. I got the plumbing vents done beforehand as well. We went with the 40 year composite tiles in a green color, since we had the edges of the roof line pained green as an accent color to the red siding. The peak of the roof is 28' high.
I also redid the roof over the old part of the house as well at this time, except for the center peak. I removed 3 sets of boards (2') from each side of the peak so I had easy access to the crawl space to do plumbing, gas lines, electrical, and so on. We also replaced the old AC ducts as well.
Plumbers helper
I consulted with my general contractor, and then his plumber, and laid out a plan for copper lines and drainage. I did a major shopping trip to buy supplies. I bought at least 2 of everything, and bags of 100 for the common parts. I went to the local Contractors Warehouse and found out that Home Depot had bought them last month. Home Depot is like the Borg in Star Trek, assimilate the opponent.
Preston is helping me drill holes for the copper plumbing lines.
I quit work at NBC, and we decided it was best to have me stay home and deal with the house, and wrangle the kids. I was doing all the domestic stuff already; cooking, cleaning, laundry, and working graveyard shift, so eliminating a job that I could pick up easily on a later date seemed best. Now I can try to sleep for more that 2 hours at a time. Kelley had just taken on a new position at her work, and got a raise as well, so the timing was right.
Fireplace
I hired a fireplace company to install my new fireplace because the regulations were daunting. I did a lot of research into what size to get for the room, what my neighbors had installed a few years ago, who was happy with what kind of unit, and what I was going to do with mine. I bought one that we could use for wood, although I plan on hooking up a gas line to it. I also did some research into the look of the screens available for this type of fireplace. I was also about this time that Kelley and I had finalized the look and theme of the major interior pieces.
We liked the look of the 9-lite dividers in the replacement windows for the bedrooms that we bought a few years earlier, and the arched tops of kitchen cupboard doors, so we used that as a guide for the interior doors, arching the tops of the room dividers that had no doors. We also finalised the windows, ordered the front door, and all new interior doors for the new AND old house. It was important to us to have the old and the new house look the same.
Framing Continues
We checked out the progress before heading out for the day. Make note of the sliding glass door, it will become french doors eventually. Our kids seem to make everything into a sword, even small scraps of lumber, tree branches, and anything that they can wrap their imagination around.
Monday, August 25, 2008
The Garage goes Naked
We removed the garage door and did alot of the flooring joists, added plywood to the front of the house so it would not be so exposed, and I put a lock on our temporary front/kitchen door. During this time I also packed for Yellowstone. The family took two weeks off and drove there and back, with my parents joining us for the trip. We felt somewhat unsure what was going to happen to our house and stuff while we were gone, but we chose to try and not worry about it, and enjoy our time away.
Old House Exposed
Today we finished tearing off the old stucco and drywall from the old section of the house, and started to put the flooring joists in. The rest of the video explains it all.
The Roof Comes Off
Today I started taking off the 2X8 tongue and groove ceiling/roof of the dining room and garage. You can see the exposed beams from the dining room extending into the open space of the new construction. I hired a few guys to help rip off the old tar and rock roof. What a dusty mess. I labeled all the board so I could reinstall it as a ceiling in the dining room, after the second story floor is finished. I plan on putting in false beams to simulate the old beams. I sealed off the rest of the house from the dust as best I could with plastic walls and tape. I worked way better than nothing, and fell short of expectations. I also stapled plastic on the inside of all the ceilings to funnel the dust falling through the cracks in the tongue and groove boards, caused by removing the tar and paper roof.